The Plan Challenge

Send us plans you already quoted.
Takeoffs back tomorrow.

Pick two or three plan sets your estimator finished by hand. We run them through your Custom AI Employee and send the takeoffs back the next day. You compare against your own numbers; that comparison is the whole pitch.

Reviewed by a human before anything runs. Your plans are never used for anything else.
Email your plans insteadBook a call

Here is a real one: North Market Street, 21 precast structures.

The same production run the homepage replays. Drag the handle: left is the raw plan an estimator stares at, right is every structure found, tagged, and counted, with real rims and depths.

Stm.MH#1
rim 925.95 · 8.55' deep · 24" RCP
C.B.#1
grate 926.81 · 4.20' deep
San.MH#2
rim 929.24 · 10.73' · 20" PVC
Stm.MH#1A
rim 923.27 · 11.85' deep
Stm.MH#7
rim 954.06 · 4.94' deep
21 STRUCTURES · RIGHT OR FLAGGED
NORTH MARKET ST · SEWER SEPARATION
AFTER
CIVIL PLAN SET · 9 SHEETS · PROFILES 4-8
BEFORE
21 / 21
structures found, tagged, counted
1
question raised for the estimator, zero guesses
Same numbers
every rerun of the same plan, byte for byte

The takeoff those 21 structures became.

Three lines, derived from the structures by code, never retyped. Pricing comes from your own catalog rates, so your numbers stay yours.

STRUCTURE TAKEOFF
NORTH MARKET STREET · SEWER SEPARATION · CONTRACT A
REAL RUN
quantities as delivered
LINESPECQTY
Sanitary Manhole 4 ftpipe seals + flowline3
Storm Manhole 4 ftpipe holes8
Double Curb Inlet2 ft x 6 ft class10
TOTAL21 structures, priced from your rates
THE ONE QUESTION IT RAISED

An unnumbered callout on sheet 8 was flagged for the estimator to decide, not counted and not guessed. That flag is the product: anything uncertain becomes a question, never a silent number.

Structures counted21 / 21
Questions raised1
Values invented0
Send your plans now

Past the takeoff: submittals and the pour schedule.

Approved takeoffs flow into shop drawings, production orders, and a schedule tied to your shop calendar. Your engineer reviews and stamps; ARC does the assembly.

MH-4
Storm manhole · 4' dia.
MH-SAN
Sanitary manhole · 4' dia.
DCI
Double curb inlet · 2'x6'
OCS
Outlet structure · per plan

Your plans. Our takeoffs. Tomorrow.

Send two or three plan sets you already quoted. Compare our takeoffs against the numbers your estimator produced. If we are not right or flagged on every structure, you have lost nothing but an email.

Send your plans nowBook a call instead